The Seller as the ability for processing the inspection of goods before shipment and to bear all expenses occured.10.2. In the case of loss or damage after goods landed at port of arrival all by the Buyer shall be made claim for quantity must be presented 15 days after arrival of goods at Haiphong Port, claim for quality within 30 days after the goods at Haiphong Port, and shall be confirmed in writting together with survey report of the goods inspection office of the VINACONTROL. The survey report of VINACONTROL should be regards as final.10.3. Whenever such claim is to be proved as of the seller's responsibility. The seller shall settle without delay.
đang được dịch, vui lòng đợi..