TRIP REPORT from 15-18/11/201515/11/2015 work at Nha Trang-Khanh HoaCoastal construction • Work with the Project Management Committee (Mr. Nam, head of the Committee, Mr. Zan-manage ME)Content:Uniform redesign items about FLV (Camera, tv, Wiffi Network.)Thiét design back to the 21st floor areas and suburbs under the scheme of Posco ICT16/11/2015 working again with details on installation and equipment up the option for the investor to choose. Son with the design plan then work with equipment manufacturers and contractors equipment advice17/11/2015 work in Hanoi (Mr. Charm – Chairman of the Board and ceo,) for details on the items and request a quote with the scheme was launched.On the same day back to Da Nang. On February 18 working in Da Nang-Mr. Gong-Fhome project. Presents the design and construction of electrical and discussion with Project BoardOn 19/11/2015: unification scheme design and editing out the details of the equipment supplies served also works as consulting projects presented to owner choiceUp the contract the General design (editing from design was available to suit the needs of engineering and aesthetic)./.Back to HCM, the same day
đang được dịch, vui lòng đợi..