On 6/1/2015 and on 7/1/2015 VATEC engineers two Mr Power, together with the staff of TEZA was undertook the survey location choice for new old location instead of the PMU in long Hoa market Township, tx coast, t TRA vinh. Then our group has worked with Mr. Feng's new Director of natural resources and environment of coastal, tx to verify again the boundaries of the scheme. Coat the details as below
đang được dịch, vui lòng đợi..