The scheduling parameter defines whether the basic dates are determined for a planned order based on the in-house production time defined in the material master, or whether a lead time scheduling is performed on the basis of the routing. The determination of basic dates is the more commonly used type of scheduling in material requirements planning and is described in greater detail in Section 8.5, Scheduling. Lead time scheduling is described in Chapter 11, Production Order Creation.